McDevitt Electrical were contracted by Alert Fire & Security Ltd to complete an emergency lighting installation at nearby council owned Craven Leisure Swimming Pool, Yorkshire.

The existing legacy emergency lighting was several years old and had failed, deeming it no longer fit for purpose.

Emergency lighting installation is an important element of any health and safety consideration. Emergency lighting systems provide a back-up through a range of operations that ensure lighting is still available in the event of a power failure or blackout. This ensures people are able to evacuate the building safely and enable emergency services are able to complete their tasks.

UK legislation currently requires new and existing buildings meet the Workplace Directive (89/654). Under legislation BS5266 public swimming pools are required to provide emergency lighting that provides a minimum of five lux across all areas.

Working with Alert Fire & Security we were able to design, source, install and provide on-going maintenance in line with their fire system installation and the Regulatory Reform (Fire Safety) Order 2005.

Considerations for Emergency Lighting Installation

Environmentally Friendly Solution.
With a completely new emergency lighting installation required, it was a great opportunity to work with Craven District Council to identify environmentally friendly solutions and consider recent changes that had been made to the building to ensure all public access areas had adequate emergency lighting provision.

Taking Brexit and Covid supply chain issues into account, we sourced LED, low energy lighting as per required specification, fire rate cabling and fixings, test key switches and necessary containment equipment that was cost effective and available for immediate installation.

McDevitt Electrical Works Included:

Pre work planning

  • Liaising with Alert Fire and Safety in relation to the fire alarm and detection system.
  • Building site plan and existing electrical provisions with Craven District Council and centre management.
  • Electrical design, drawings, considerations, and recommendations report submission to Alert Fire & Security and Craven District Council for approval to commence works.
  • Sourcing off all materials including
  • Accessibility to a public building in order to carry out maintenance works at height and large water holdings.
  • Shift patterns for McDevitt & Electrical Contractors to complete works through the night to enable public daytime access.

Works Completed

  • Complete emergency lighting installation throughout the centre including pool areas, exercise studios, gym areas, offices, canteen and dining areas, changing rooms, corridors and plant rooms.
  • Installation, testing and commissioning of LED panels, fire rate cabling and fixings, test key switches and necessary containment equipment.
  • Full works completed from survey within 8 weeks.

 

Post Works:

  • On-going maintenance as required.

Emergency Lighting around pool

Works completed through the night, out of hours

Emergency Lighting over pool

Safety considerations over pool

Lighting for Locker area

Lighting for Locker area

Client Feedback:

As this work was contracted to us by fire and security company Alert Fire & Security (a Churches Fire Group Company) it was imperative we ensured both our client and the end user, Craven District Council had regular and clear communication.

We were delighted with the feedback.

Account Manager at Alert Fire & Security Lindsey Robinson stated “Sam and the team at McDevitt Electricals Contractors did a superb job for us”.

“When outsourcing electrical work, it is obviously important to choose a reputable provider to deliver quality and compliant work with clear communication and mutual understanding. McDevitt’s have never let us down and Craven District Council were delighted with us managing the overall project and sourcing McDevitts on their behalf.

Anthony Slater of Craven Swimming Pool commented, “I am really happy with the result”.
McDevitt’s site manager Craig were really helpful and he is a credit to your organisation. All the staff were respectful there were working in a public place and ensure the safety everyone on-site was paramount at all times.

How We Can Help You?